On Saturday, October 3, from 7:00 a.m. to noon, a crane will be positioned on the north side of the Pittsburgh Building for AHU cold water coil work. The roadway from 8th Street to the Walker Laboratory Building and walkways between Amos Eaton and the Pittsburgh Building, including those in front of Pittsburgh, will be closed during this time. Barricades, cones, and personnel will be in place to direct pedestrians around the work area. Please plan to use alternate routes.
Remote URL
https://administration.rpi.edu/announcements/roadway-and-walkway-closures-near-pittsburgh-building-october-3-2026
Audience